CTA

Orange Line Trains to Reroute on Loop Elevated Tracks on Sunday, January 31

January 28, 2010

Orange Line trains in the Loop will be temporarily rerouted to operate on the Brown Line tracks from approximately 5:50 a.m. until 3 p.m. on Sunday, January 31 due to track work.  Orange Line trains will be rerouted from the inner track to the outer Loop track, and travel counterclockwise.

Entering the Loop, Orange Line trains will make their first stop at Adams/Wabash, then Madison/Wabash, Randolph/Wabash, State/Lake, Clark/Lake, Washington/Wells, Quincy/Wells, LaSalle/Van Buren and Library, then proceed to Roosevelt and resume the normal route.

Crews will install new switching equipment as part of the Loop Signal project that will replace the signal and train control systems in the Loop. 

The Loop Signal replacement project is expected to conclude in late 2010.  The project is being conducted in phases to help minimize the impact to customers.  The majority of the work has taken place on weekends and in the early morning hours.

# # #

Back to news
System status snapshot
‘L’ route status
Red Line
Normal Service
Brown Line
Normal Service
Green Line
Normal Service
Orange Line
Normal Service
Pink Line
Normal Service
Purple Line
Normal Service
Yellow Line
Normal Service
Bus routes w/alerts
Elevator alerts