CTA

Slow Zone Prevention & Signal Work on Loop Elevated Continues

November 11, 2008

Brown, Green, Orange and Pink Line Trains
Rerouted Through Loop

The CTA is performing slow zone prevention work this week on the Loop elevated tracks. Crews are replacing track and rail ties, and installing a new signal and train control system at the Loop junction of Van Buren/Wabash (Tower 12) and Lake/Wells (Tower 18). The new systems will help to improve the reliability of service by regulating train movement, speed and intervals.

The most intense work is scheduled on the Lake Street and Wabash Avenue tracks resulting in reroutes for Brown, Orange, Pink and Green Line trains. The work for this phase of the project on the elevated lines is scheduled to continue through Thanksgiving 2008.

Northbound Green Line trains and Brown Line trains will be rerouted in the Loop on Tuesday, November 11 from 10 p.m. until 4 a.m. the following morning and again on Wednesday night from 10 p.m. until 4 a.m. the following morning.

Brown Line trains will be rerouted from the outer track to the inner Loop track, and travel clockwise. Entering the Loop, Brown Line trains will make their first stop at Clark/Lake, then State/Lake, Randolph/Wabash, Madison/Wabash, Adams/Wabash, Library, LaSalle/Van Buren, Quincy/Wells and Washington/Wells, then proceed to the Merchandise Mart and resume the normal route.

Northbound Green Line trains will be rerouted from the outer tracks along Wabash and Lake to the inner Loop tracks along Van Buren and Wells. Northbound Green Line trains will make their first stop at Library, then LaSalle/Van Buren, Quincy/Wells and Washington/Wells, then proceed to Clinton and resume the regular route. Southbound Green Line trains and Orange and Pink Line trains will operate normally on the inner track along Lake and Wabash streets.

Beginning at 10 p.m. Thursday, November 13 until 4 a.m. Friday, November 14 and again from 10 p.m. Friday until 4 a.m. Saturday, November 15, Green, Pink and Orange Line trains operating on the elevated structure will be rerouted to the Wells and Van Buren sections of track.

Orange Line trains from Midway will be rerouted from the inner track to the outer Loop track, and travel counterclockwise. Entering the Loop, Orange Line trains will make their first stop at Adams/Wabash, Madison/Wabash, Randolph/Wabash, State/Lake, Clark/Lake, Washington/Wells, Quincy/Wells, LaSalle/Van Buren and Library, then proceed to Roosevelt and resume the normal route.

Green Line trains from Harlem/Lake will enter the Loop from Clinton and be rerouted to the outer Loop track along Wells and Van Buren. Southbound Green Line trains will make their first stop at Washington/Wells, Quincy/Wells, LaSalle/Van Buren and Library, then proceed to Roosevelt where they will resume normal southbound service.

Pink Line trains will enter the Loop from Clinton and be rerouted to the outer Loop track. Entering the Loop from Clinton, Pink Line trains will make their first stop at Washington/Wells, then Quincy/Wells, LaSalle/Van Buren and Library, where they will turn and resume normal westbound service on the inner Loop track with the first stop at Library/Van Buren.

Back to news
System status snapshot
‘L’ route status
Brown Line
Normal Service
Green Line
Normal Service
Orange Line
Normal Service
Pink Line
Normal Service
Purple Line
Normal Service
Yellow Line
Normal Service
Bus routes w/alerts
Elevator alerts